Phase I & II Ground Investigation:
Kent, England

Working on active sites always requires careful planning and communication, but our Phase I & II investigation at this site in Kent went extremely smoothly. This is an operational car sales and repair garage which is being extended, and our investigations will provide valuable data to allow 'value engineering'.​

​

Works Undertaken:  Communication with Site Staff (Before Start and During Works), Window Sampler Drilling, Sampling and Analysis of Soils, Production of Phase I & II Geo-Environmental Report

20230302_135401.jpg

Phase I & II Ground Investigation: East Midlands

This site was a heavily overgrown historic allotment garden area which was hiding a lot of secrets! It had multiple geological features, nearby tunnels and even undiscovered WW2 air raid shelters on site and nearby.​

​

With the benefit of a thorough and careful 'Phase 1 Desk Study' we were able to pinpoint potential areas of concern in advance of the investigation, which were then fully investigated. This was supplemented by a 'piling investigation' to confirm the strength of deeper soils for piled foundations. 

​

Works Undertaken:  Desk Study, Local Specialist Enquiries, Window Sampler Drilling, 'Deep' Rotary Drilling, Sampling and Analysis of Soils, 'BRE' Soakaway Tests, Production of Phase I & Phase II Geo-Environmental Report

20230411_122115.jpg

Phase I & II Ground Investigation:
West Midlands

This derelict former hospital facility was â€‹situated in a very urban location and had suffered severe neglect over the years. Our Client had exciting plans to turn this into valuable commercial and residential properties and we were lucky enough to be asked to assist.

 

The site itself presented significant restrictions to our investigations and it also presented sever health and safety risks, but with proper planning we were able to deliver an investigation safely and successfully!

​

Works Undertaken:  Desk Study, 'BRE' Soakaway Tests, Window Sampler Drilling, Sampling and Analysis of Soils, Production of Phase I & Phase II Geo-Environmental Report

20220310_101929a.jpg

Phase I & II Ground Investigation, South-West England

This site looked like an undisturbed field which had never been developed. However, our 'Phase I Desk Study' found that it had been partly used as a historic landfill, and the following investigations  â€‹therefore needed careful planning. 

​

With help from the local wildlife we were able to fully investigate this site and we encouraged early liaison with regulators and alternative foundation contractors so that our Client found the best solutions as early as they possibly could. We can't wait to see this one redeveloped!

​

Works Undertaken:  Desk Study, 'BRE' Soakaway Tests, Window Sampler Drilling, Sampling and Analysis of Soils, Production of Phase I & Phase II Geo-Environmental Report

20230505_103927(0).jpg

'BRE' Soakaway Testing, South Wales

Sites don't come much prettier than this! â€‹

​

As part of their planning application our Client required in situ 'BRE' soakaway testing, which was completed safely and successfully on this scheme.

​

We were made aware of severe time restrictions with this site, so the initial calculations and site data were packaged and released just a few hours after our works were complete. 

​

Works Undertaken:  'BRE' Soakaway Tests

20230118_080535.jpg

Phase II Ground Investigation:
Northern England

This site is an active upmarket gym which required an investigation in their tennis court areas. In order to maintain their high standards and levels of service, 'clean' drilling was required alongside a speedy completion of the works so that the areas could be returned to use as promptly as possible.​

​

With careful preparation of the drilling areas we successfully managed to complete the investigation and obtain sufficient information for our report, and the site was returned to its original clean and tidy state!

​

Works Undertaken:  Window Sampler Drilling, Sampling and Analysis of Soils, Production of Phase II Geo-Environmental Report

DLT20220520.jpg

Phase I & II Ground Investigation:
Southern England

This project involved a requirement for ground investigation works within and around an operational factory which was undergoing major reconstruction works of their Grade II listed building.  The ground investigation was critical for the structural engineering appraisal, and had to take place in a tight timeframe which did not impact the factory's operations. â€‹

​

Close involvement was needed for the investigation between our engineers, the local council, the structural engineers and various other architects, designers and planners. 

​

Works Undertaken:  Window Sampler Drilling, Installation of Monitoring Wells, Sampling and Analysis of Soils, Monitoring of Ground Gas and Vapours, Production of Phase II Geo-Environmental Report

20220207_092638.jpg

Phase II Ground Investigation:
Greenfield Site in Central England

This multi-technique project was undertaken for a residential developer in the Midlands. The site presented complex ground conditions including shallow bedrock, unknown groundwater levels and areas of contaminated made ground. 

 

With the help of historic mapping, appropriate investigation techniques and discussions with the Local Authority, we were able to help our client to identify the risks to their scheme at an early stage.  

​

Works Undertaken: Trial Pitting, Window Sampler Drilling, Installation of Monitoring Wells, Sampling and Analysis of Soils, Production of Phase II Geo-Environmental Report

20210903_104321.jpg

Phase I & II Ground Investigation:
Greenfield Site in East England

This site appeared to be an open agricultural field, but our Phase I Desk Study highlighted multiple past uses which needed to be examined in more detail. With the help of our client, we managed to assess the site and derive a suitable investigation strategy. 

​

The ground investigation works uncovered several areas across the site which would have presented the client with some unforeseen 'abnormals' and unexpected construction costs, but our inspection, investigation and analysis of these areas enabled them to quantify their risks prior to purchase. 

​

Works Undertaken: Trial Pitting, Window Sampler Drilling, Installation of Monitoring Wells, Sampling and Analysis of Soils, Soakaway Testing (to BRE365) Production of Phase I & II Geo-Environmental Report

20210812_120922.jpg

Phase II Ground Investigation:
Industrial Site in South-East England

This site presented multiple highly complex risks to development including potentially significant geotechnical constraints and contamination hazards. 

​

After mobilising rapidly to site we were able to investigate the ground conditions and provide our client with the necessary data to allow them to confirm their risks and liabilities. 

​

Works Undertaken: Window Sampler Drilling, Production of Phase II Geo-Environmental Report

Abandoned Warehouse.jpg

Phase II Ground Investigation:
Medical Centre in Southern England

This site was planning to construct two extensions in areas of the site which had limited access. By choosing the right techniques and liaising with site staff we were able to deliver a successful investigation for our Client. 

​

​

Works Undertaken: Window Sampler Drilling, Production of Phase II Geo-Environmental Report

20210916_115053-min.jpg

Phase I & II Ground Investigation:
Brownfield Site in West Midlands

This multi-technique project included a  Phase I Desk Study, an initial Phase II ground investigation using window sampler drilling and a secondary Phase II investigation using deep rotary drilling techniques. The site had a history of potential unexploded ordnance (UXO) so the works were accompanied and checked by a UXO Engineer to keep the site team safe at all times.

 

The Client was building an outdoor pool and the investigation revealed complex ground conditions, but the design works were able to successfully compensate for these to ensure successful delivery of the project.

​

​

Works Undertaken: Desk Study, Initial UXO Search, Window Sampler Drilling, Rotary Drilling, Sampling and Analysis of Soils and Rock Cores, Production of Phase I & II Geo-Environmental Report

UXO CHeck on Drilling Borehole Location.jpg

Gas Monitoring: South-Eastern England

Monitoring of ground gas and groundwater levels is a service we often supply. The local planning authority asked for gas monitoring to be undertaken at this site so that ground gas risks could be ruled-out. Engineers from Elemental GI Ltd undertook the monitoring and assessment of gas levels using the latest fully-calibrated equipment to the satisfaction of the regulators and our Client.

​

​

Works Undertaken: Installation of Combined Gas / Groundwater Monitoring Wells, Monitoring of Ground Gas Over a 3-Month Period, Ground Gas Assessment / Classification Report

Gas Monitoring at Borehole.jpg

Phase I & II Ground Investigation:
East Coast of England

This multi-technique project was undertaken for a residential developer  on the east coast of England. Very shallow groundwater and extremely soft soil strengths presented significant potential issues for development,  but with in situ plate / CBR testing, the developer was armed with the information they needed to maximise their understanding of the risks involved. 

 

This project involved working closely with our Client, the regulators, specialist drainage engineers and site-based testing specialists. 

​

Works Undertaken: Trial Pitting, Window Sampler Drilling, Installation of Monitoring Wells, Sampling and Analysis of Soils, CBR / Plate Testing and Production of Phase II Geo-Environmental Report

Plate Testing.jpg

Phase I & II Ground Investigation:
West Midlands (England)

This project was undertaken for a residential developer in the West Midlands. The site appeared to be very straight-forward, but hidden historic features and more recent unrecorded activities had left a legacy of soil and ground gas impacts which needed careful consideration. 

 

This site required extra caution and detailed review at the GI planning stage so that the investigation would be sure to provide the answers required. 

​

Works Undertaken: Enhanced Phase I Desk Study, Window Sampler Drilling, Installation of Monitoring Wells, Sampling and Analysis of Soils, Ground Gas Monitoring and Production of Phase II Geo-Environmental Report

Contaminated Land.jfif

Phase II Ground Investigation:
Southern England

This project was undertaken for a site which belongs to a nationwide commercial Client. The site was in a densely populated urban area, and had severe access restrictions. However, through careful liaison with the drilling teams and site staff we were able to gain entry and undertake the investigation successfully. 

​

Works Undertaken: Window Sampler Drilling, Installation of Monitoring Wells, Sampling and Analysis of Soils, Ground Gas Monitoring and Production of Phase II Geo-Environmental Report

Logging a Window Sampler Core.jpg

Phase II Ground Investigation:
Central England

Our investigation works on this site were undertaken on a rapid-mobilisation and rapid-turnaround for our Client to help them meet their own urgent deadline. The drilling works needed to be safely undertaken during active construction and demolition works, which involved close co-operation between Elemental GI Ltd and the site's management team. â€‹

​

The investigation was delivered safely and promptly, which let the Client move on with their designs unhindered. They also benefitted greatly from the addition of invaluable information on the site's ground conditions.  

​

Works Undertaken:  Window Sampler Drilling, Sampling and Analysis of Soils, Production of Phase II Geo-Environmental Report

Safe Drilling on Demolition Site.jpg

Supplementary Phase II Investigation: Southern England

This is a site we had already investigated, but the Client required further information relating to some previously inaccessible areas. These tricky access â€‹issues meant that several areas had to be approached carefully, but with the right apparatus we were able to deliver further vital information which was used to help with the sale of the site. 

 

​

Works Undertaken:  Re-Assessment of Access Limitations, Window Sampler Drilling, Sampling and Analysis of Soils, Production of Supplementary Phase II Geo-Environmental Report

Contaminated Barrels

In Situ Soakaway Tests: South Wales

We were excited to be involved with this multi-hectare potential residential development scheme in South Wales. The site was one of the most picturesque we've ever been to, but the underlying geology and hydro-geology presented the development team with a lot of risks and potential constraints. With the help of geological reviews and targeted testing we were able to help find the best options.  

 

​

Works Undertaken:  Desk Based Review of Potential Ground Conditions, In Situ 'BRE365' Soakaway Testing

20221201_101342.jpg

Phase I & II Ground Investigation:
Midlands

This greenfield site in the Midlands was selected for initial investigation by our Client. Our works here included a Phase I 'Desk Study' and Phase II Investigation. â€‹

​

The investigation was completed on time and to the satisfaction of the land owner and Client.  

​

Works Undertaken:  Phase I, Window Sampler Drilling, Sampling and Analysis of Soils, Ground Gas Monitoring, Production of Phase II Geo-Environmental Report

IMG-20220901-WA0019.jpg